USU Renovation (Phase II)
Northridge, California
Project Description
30,000 Sq. Ft. of new 2 ½ story building with concrete slab, To construct 4 new buildings about 32,000 Sq. Ft. of concrete slab,
CMU and tilt-up walls with
structural steel frames and metal
deck including a new photovoltaic solar panel system for thee
buildings, and installation of
owner furnished dust control
and fuel tank storage for Shop
building on about 3 acres with concrete, asphalt, landscaping,
fences and controlled operating
gates, and decorative railing.
structural steel frame and metal
stud walls, metal deck with related
site work with seat walls, planter
walls, planting, all site concrete
work.
Owner/Architect
California State University-Northridge (CSUN)
Facilities Planning, Design and Construction
(818) 677-7720
Date Completed
2006
Amount
$13,979,000 |
 |
 |