USU Renovation (Phase II)
Northridge, California

 
Project Description
30,000 Sq. Ft. of new 2 ½ story building with concrete slab, To construct 4 new buildings about 32,000 Sq. Ft. of concrete slab, CMU and tilt-up walls with structural steel frames and metal deck including a new photovoltaic solar panel system for thee buildings, and installation of owner furnished dust control and fuel tank storage for Shop building on about 3 acres with concrete, asphalt, landscaping, fences and controlled operating gates, and decorative railing. structural steel frame and metal stud walls, metal deck with related site work with seat walls, planter walls, planting, all site concrete work.

Owner/Architect
California State University-Northridge (CSUN)
Facilities Planning, Design and Construction

(818) 677-7720 

Date Completed
06/12/2006

Amount
$8,950,405

For additional information about our  public projects or general information about  Ford E.C. Inc., please contact us.


 

   

 

© Ford E.C., Inc. All Rights Reserved. Website Design by Sixty Five Design