Temporary Facilities Relocation of Swing Space At East L.A. College

Monterey Park, California

 
Project Description
Work includes but is not limited to installation of (13) 24x 40 pre-manufactured modular classroom buildings, (1) pre-manufactured modular restroom building and new foundations per drawings, site utility connections and associated paths, lighting and landscaping. Installation of (9) 24x40 pre manufactured modular classroom buildings and new foundation per drawings, site utility connections and landscaping at site indicated on drawings as tech quad site both sites require asphaltic concrete paving, site fencing and installation of various stone site finishes.

Owner/Architect
East Los Angeles Community College / Los Angeles Community College District
(310)458-2275 

Date Completed
2007

Amount
$1,818,256

For additional information about our  public projects or general information about  Ford E.C. Inc., please contact us.


 

   

 

© Ford E.C., Inc. All Rights Reserved. Website Design by Sixty Five Design