|
Temporary Facilities
Relocation of Swing
Space At East L.A.
College
Monterey Park, California
Project Description
Work includes but is not limited to installation of (13) 24x 40 pre-manufactured modular classroom buildings, (1) pre-manufactured modular restroom building and new foundations per drawings, site utility connections and associated paths, lighting and landscaping. Installation of (9) 24x40 pre manufactured modular classroom buildings and new foundation per drawings, site utility connections and landscaping at site indicated on drawings as tech quad site both sites require asphaltic concrete paving, site fencing and installation of various stone site finishes.
Owner/Architect
East Los Angeles Community College /
Los Angeles
Community
College District
(310)458-2275
Date Completed
2007
Amount
$1,818,256 |
 |
 |
For additional information about our
public projects or general information about
Ford E.C. Inc., please
contact us.
|