Ford E.C. provides clients with the highest level of quality construction. To learn more about educational projects our team
has worked on, please browse our list below:

 
Property Photo Project Description Owner/Architect Amount
 
Additional Photos
And Information
Temporary Facilities- Relocation OF Swing Space (Site & Installation)
Los Angeles, California

 
Installation of 13 pre-manufactured modular classroom buildings, 1 pre-manufactured modular restroom building with new foundations, site utilities and walkway paths, lighting & landscaping. Installation of 9 pre manufactured modular classroom buildings and new foundation, site utilities and landscaping. Both sites require asphalt & concrete paving, new site fencing and gates.

Completed
  $1,818,256

Additional Photos
And Information
Manchester Jr. Art Center / Vision Theater Phase 1A & 1B
Los Angeles, California

 
To remodel and rehab of an existing 19,400 square feet theater, including selective demolition to existing interior partitions in first and second floor, selective building alteration and remodel of combined first and second floor totaling 7,100 square feet, second floor addition of 2,000 square feet including classroom, offices, restroom and electrical room, complete HVAC, electrical and fire alarm upgrades, new roof covering, plaster, complete historic preservation of interior architectural features, marquee sign and tower.

Completed 10/25/2012
City of Los Angeles Board of Public Works $5,074,537

Additional Photos
And Information
University Student Union
Cal State University at Channel Islands

Camarillo, California
 
Construction of a new 2 story
Student Union facility, as well as remodeling & rehab of existing attached library for the California
State University at Channel Islands, including demolition of the existing single story cast-in-palace concrete wing (approximately 1,800 square feet), concrete walls, other site structures, and underground utilities on and off-site, abatement of hazardous materials inside the building, in the existing crawl space and encasing underground utilities
on and off-site. The new two story building (15,000 square feet) will house dining, lounge and food
service facilities and complete
kitchen on the ground floor and
office space on the second floor,
toilet rooms, storage, electrical/IT closets and related spaces are included in the new structure. New steel braced frame with suspended concrete/metal deck floor and roof supported on concrete spread foundation system to replace the demolished wing.

Completed: 03/15/2010
California State University Channel Islands
Procurement And Contract Services
$9,612,419

Additional Photos
And Information
Facilities Management
and Operations Headquarters (FMO)
At Harbor College

Wilmington, California
 
To construct 4 new buildings
about 32,000 Sq. Ft. of concrete
slab, CMU and tilt-up walls with structural steel frames and metal deck including a new photovoltaic solar panel system for thee
buildings, and installation of owner furnished dust control and fuel tank storage for Shop building on about
3 acres with concrete, asphalt, landscaping, fences and controlled operating gates, and decorative railing. 

Completed: 2008
Los Angeles Community
College District
$12,673,011

Additional Photos
And Information
USU Renovation
Phase II

Northridge, California

 
30,000 Sq. Ft. of new 2 ½ story building with concrete slab, To construct 4 new buildings about 32,000 Sq. Ft. of concrete slab,
CMU and tilt-up walls with
structural steel frames and metal
deck including a new photovoltaic solar panel system for thee
buildings, and installation of
owner furnished dust control
and fuel tank storage for Shop
building on about 3 acres with concrete, asphalt, landscaping,
fences and controlled operating
gates, and decorative railing. 
structural steel frame and metal
stud walls, metal deck with related
site work with seat walls, planter
walls, planting, all site concrete
work.

Completed: 06/12/2006
California State University-Northridge (CSUN) Facilities Planning, Design and Construction
(818) 677-7720  

 
$8,950,405

Additional Photos
And Information
USU Renovation
Phase I

Northridge, California
 
Remodeling & rehab of existing
pub building  included all kitchen
work & interior restaurant are, 3
new building included Subway, Telecomm building, & restroom facilities & ticket booth, &
demolition of existing hub
building ready for phase II included
all underground utilities & site work.

Completed: 10/27/2004
California State University-Northridge (CSUN) Facilities Planning, Design and Construction
(818) 677-2561  
$5,461,957

Additional Photos
And Information
Sierra Center
California State
University Northridge (CSUN)

Northridge, California
3-story new construction of Sierra Alumni Center Bldg. at Northridge CSUN campus about 30000 S.Ft. with Parking and driveways,
planters and landscaping will complete the project.

Completed: 2003
California State University-Northridge
(818) 677-2561
$3,114,251

Additional Photos
And Information
Science Buildings 1, 3 & 4 (Repairs) At CSUN 
Northridge, California
 
Seismic Retrofit for existing Bldg. 3 and 4 included soldier piles, reinforcement of existing concrete columns, beams, foundation,
painting of exterior walls,
replacement of twelve storefronts, addition of one ramp, and
remodeling of six bathrooms in
Bldg. 1.

Completed: 2001
DMJM/JGM
(714) 895-8948
$2,573,700

 
West High School
Torrance, California
 
Remodeling of existing 9
buildings (about 234,000 sq. ft.) included interior and exterior
paint, removal and re installing
all doors and hardware, new
switch gear and interior and exterior electrical conduit and wiring for
all buildings, addition of exhaust
fans and heating and cooling
units, remodeling of plumbing and
tile work at existing bathrooms.  

Completed: 2001
Torrance Unified
School District

310-972-6211
 
$2,573,700

 
Thurston Middle School
Laguna Beach, California
 
New Construction; approx.
17,000 sq. ft. of Concrete slab
and wood framing and related
site work. New classrooms
Completed: 1996
Laguna Beach
School District

(714)497-7785
$2,573,700

 
Glendale College
Hi-Tech Center addition
to Technical Bldg. T-1

Glendale, California
 
Addition & Remodel of Hi-
Technical Building T-1

Completed: 1995
Glendale College
818-551-5122
$2,573,700
 
 

For additional information about our military public projects or general information about  Ford E.C. Inc., please contact us.

 

   

 

© Ford E.C., Inc. All Rights Reserved. Website Design by Sixty Five Design