|
Ford E.C. provides clients with the highest
level of quality construction. To learn more about
educational projects our team
has worked on,
please browse our list below:
|
Property Photo |
Project |
Description |
Owner/Architect |
Amount |
|
Manchester Jr.
Art Center / Vision Theater Phase 1A
& 1B
Los Angeles, California
|
To remodel and rehab of an existing 19,400 square feet theater, including selective demolition to existing interior partitions in first and second floor, selective building alteration and remodel of combined first and second floor totaling 7,100 square feet, second floor addition of 2,000 square feet including classroom, offices, restroom and electrical room, complete HVAC, electrical and fire alarm upgrades, new roof covering, plaster, complete historic preservation of interior architectural features, marquee sign and tower.
In Progress |
City of Los Angeles Board of Public
Works |
$3,744,500 |
|
|
 |
|
|
|
University Student Union
Cal State University at Channel
Islands
Camarillo, California
|
Construction of a new 2 story
Student Union facility, as well as
remodeling & rehab of existing
attached library for the California
State University at Channel Islands,
including demolition of the existing
single story cast-in-palace concrete
wing (approximately 1,800 square
feet), concrete walls, other site
structures, and underground
utilities on and off-site, abatement
of hazardous materials inside the
building, in the existing crawl
space and encasing underground
utilities
on and off-site. The new two story
building (15,000 square feet) will
house dining, lounge and food
service facilities and complete
kitchen on the ground floor and
office space on the second floor,
toilet rooms, storage, electrical/IT
closets and related spaces are
included in the new structure. New
steel braced frame with suspended
concrete/metal deck floor and roof
supported on concrete spread
foundation system to replace the
demolished wing.
Completed: 2010 |
California State University Channel
Islands
Procurement And Contract Services
|
$8,507,700 |
|
|
|
 |
|
|
|
Facilities Management
and Operations Headquarters (FMO)
At Harbor College
Wilmington, California
|
To construct 4 new buildings
about 32,000 Sq. Ft. of concrete
slab, CMU and tilt-up walls with structural steel frames and metal deck including a new photovoltaic solar panel system for thee
buildings, and installation of owner furnished dust control and fuel tank storage for Shop building on about
3 acres with concrete, asphalt, landscaping, fences and controlled operating gates, and decorative railing.
Completed: 2008 |
Los Angeles Community
College District |
$12,673,011 |
|
|
|
 |
|
|
|
USU Renovation
Phase II
Northridge, California
|
30,000 Sq. Ft. of new 2 ½ story building with concrete slab,
To construct 4 new buildings about 32,000 Sq. Ft. of concrete slab,
CMU and tilt-up walls with
structural steel frames and metal
deck including a new photovoltaic solar panel system for thee
buildings, and installation of
owner furnished dust control
and fuel tank storage for Shop
building on about 3 acres with concrete, asphalt, landscaping,
fences and controlled operating
gates, and decorative railing.
structural steel frame and metal
stud walls, metal deck with related
site work with seat walls, planter
walls, planting, all site concrete
work.
Completed: 2006 |
California State University-Northridge (CSUN)
Facilities Planning, Design and Construction
(818) 677-7720
|
$13,979,000 |
|
|
|
 |
|
|
|
USU Renovation
Phase I
Northridge, California
|
Remodeling & rehab of existing
pub building included all kitchen
work & interior restaurant are, 3
new building included Subway, Telecomm building, & restroom facilities & ticket booth, &
demolition of existing hub
building ready for phase II included
all underground utilities & site work.
Completed: 2004 |
California State University-Northridge (CSUN)
Facilities Planning, Design and Construction
(818) 677-2561 |
$9,251,143 |
|
Sierra Center
California State
University Northridge (CSUN)
Northridge, California |
3-story new construction of Sierra Alumni Center Bldg. at Northridge CSUN campus about 30000 S.Ft. with Parking and driveways,
planters and landscaping will complete the project.
Completed: 2003 |
California State University-Northridge
(818) 677-2561 |
$3,114,251 |
|
|
Science Buildings 1, 3 & 4 (Repairs)
At CSUN
Northridge, California
|
Seismic Retrofit for existing Bldg. 3 and 4 included soldier piles, reinforcement of existing concrete columns, beams, foundation,
painting of exterior walls,
replacement of twelve storefronts, addition of one ramp, and
remodeling of six bathrooms in
Bldg. 1.
Completed: 2001 |
DMJM/JGM
(714) 895-8948 |
$2,573,700 |
|
|
West High School
Torrance, California
|
Remodeling of existing 9
buildings (about 234,000 sq. ft.)
included interior and exterior
paint, removal and re installing
all doors and hardware, new
switch gear and interior and
exterior electrical conduit and
wiring for
all buildings, addition of exhaust
fans and heating and cooling
units, remodeling of plumbing and
tile work at existing bathrooms.
Completed: 2001 |
Torrance Unified
School District
310-972-6211
|
$2,573,700 |
|
|
Thurston Middle School
Laguna Beach, California
|
New Construction; approx.
17,000 sq. ft. of Concrete slab
and wood framing and related
site work. New classrooms
Completed: 1996 |
Laguna Beach
School District
(714)497-7785 |
$2,573,700 |
|
|
Glendale College
Hi-Tech Center
addition
to Technical Bldg. T-1
Glendale, California
|
Addition & Remodel of Hi-
Technical Building T-1
Completed: 1995 |
Glendale College
818-551-5122 |
$2,573,700 |
|
For additional information about our military
public projects or general information about
Ford E.C. Inc., please
contact us.
|