Ford E.C. provides our clients with the highest
level of quality construction. To learn more about
industrial projects our team
has worked on,
please browse our list below:
|
Property Photo |
Project |
Description |
Owner/Architect |
Amount |
|
MTA Division 21 Body Shop
Los Angeles, California
|
To remodel and rehab of 7,000 S.F. existing storage to new body shop facility for MTA trains including track relocation, concrete foundations and pits, new overhead cantenary system, new electric power pole for the cantenary system, fall arrest system for trains, all seismic work for reinforcing of existing foundation and related site work.
Completed: 2011 |
Metropolitan Transportation
Authority |
$5,333,350 |
|
 |
|
|
|
Hyperion Treatment Plant Environmental Learning Center West
Playa Del Rey, California
|
Remodeling and renovation of 19,900 sq/ft of existing two story concrete wall and slab building included seismic renovation and Asbestos abatement, new interior wall, new stairs, new railing, new elevator, new windows and curtain walls, site utilities improvement with new landscaping, irrigation and remodeling and extension of existing exterior pond and preparation of 15 new interactive exhibitions for water treatment plant facility for City of Los Angeles. The building is designed to achieve Gold LEED certification rating.
Completed: 2011 |
City Of Los Angeles
Environmental Engineering Division |
$9,500,000 |
|
 |
|
|
|
Beverly Hills Public
Works Vehicle Shop
Beverly Hills, California
|
One and half story concrete block
on concrete slab with structural
steel and metal deck and built up roofing for city of Beverly Hills
repair and maintenance, contains tons bridge crane and oil
lubrication system with 3 bay stations, all site utility
underground and removal and relocation of existing electrical conduit encasement (duct bank)
for southern California Edison Company, relocation of existing generator, cutting and replacing of existing fuel tank canopy,
completion of all landscaping,
site retaining walls, site concrete, and site utilities per plans and specifications.
Completed: 2008 |
City of Beverly Hills
Project Administration |
$9,509,450 |
|
 |
|
|
|
Facilities Management
and Operations Headquarters At
Harbor College
Wilmington, California
|
To construct 4 new buildings
about 32,000 Sq. Ft. of concrete
slab, CMU and tilt-up walls with structural steel frames and metal deck including a new photovoltaic solar panel system for thee buildings, and installation of owner furnished dust control and fuel tank storage for Shop building on
about 3 acres with concrete,
asphalt, landscaping, fences
and controlled operating gates,
and decorative railing.
Completed: 2008 |
Los Angeles
Community
College District |
$12,673,011 |
|
|
|
 |
|
|
|
Corporation Yard - California State University Northridge (CSUN)
Northridge, California |
Four bldgs. (1 story) (new construction), 32,000 sq. ft, and related site work.
The construction of 4 new buildings with concrete
slab and tilt-up walls, masonry
walls, structural steel and metal deck, and related site asphalt and utilities, landscape & irrigation.
Completed: 2002 |
California State University-Northridge (CSUN)
Facilities Planning Dept
(818) 677-2561 |
$6,115,127 |
|
|
Culver City Transportation Facility
Public Services Building
Phase 1
City of Culver City, California
|
Remodeling and addition of
30,000 sq.ft. of an existing bldg.
to new equipment shop and office space, and related site
improvement.
Completed: 1997 |
The JCM Group
(Const. Mngr)
(310)474-6868
City of Culver City,
Dept of Transportation
310-253-6500
|
$2,251,688 |
|
 |
DWP Van Nuys Facility
Van Nuys, California
|
Truckshed & Warehouse
Completed: 1993 |
Los Angeles DWP
(213) 481-5451
|
$1,644,917 |
For additional information about our military
public projects or general information about
Ford E.C. Inc., please