|
Ford E.C. provides clients with the highest
level of quality construction. To learn more about
infrastructure projects our team
has worked on,
please browse our list below:
|
Property Photo |
Project |
Description |
Owner/Architect |
Amount |

|
Hyperion Treatment Plant Environmental Learning Center West
Playa Del Rey, California
|
Remodeling and renovation of 19,900 sq/ft of existing two story concrete wall and slab building included seismic renovation and Asbestos abatement, new interior wall, new stairs, new railing, new elevator, new windows and curtain walls, site utilities improvement with new landscaping, irrigation and remodeling and extension of existing exterior pond and preparation of 15 new interactive exhibitions for water treatment plant facility for City of Los Angeles. The building is designed to achieve Gold LEED certification rating.
In Progress |
City Of Los Angeles
Environmental Engineering Division |
$9,500,000 |
|
 |
|
|
|
|
|
|
Utility Infrastructure
Monterey Park, California |
To excavate and remove about 50,000 cubic feet of soil and
design and built about 950
liner feet of shoring for future
parking structure about 4,000
linear feet of conduit and trenching and duct bank for electrical
work-and pulling about 30,000
linear feet of telecommunication
and fiber optic wiring.
To complete street improvement an Avenida Cesar Chavez included saw
cutting of existing sidewalk, new sidewalk, new curb & gutter,
street lighting modification,
relocation of existing bus stop
and miscellaneous street improvement.
To build a new temporary parking area about 134,000 square foot and fire road
Completed: 2006 |
East Los Angeles College/ LA
Community
College District
(213)-891-2000 |
$6,242,000 |
|
|
|
 |
|
|
|
Excavation & Utility
Relocation
Santa Monica, California
|
Demolish and expansion of
existing 150,000 sq. ft. of parking
lot, related site utilities relocation, landscape irrigation, and seismic work on existing police station.
Also, excavation of 50,000 sq. ft. of new subterranean parking approx. 26
feet deep included soldier piles shoring systems and shotcrete of existing storm drain.
Consist of 5 phases: (1) demolition and civic parking re-model (2) soldier piles and mass excavation (3) utility relocation (4) removal of dirt ramps (5) tie-back detensioning
Completed: 2000 |
City of Santa Monica Engineering
Department
(310)458-2275 |
$3,794,751 |
For additional information about our military
public projects or general information about
Ford E.C. Inc., please
contact us.
|