Ford E.C. provides clients with the highest level of quality construction. To learn more about infrastructure projects our team
has worked on, please browse our list below:

 
Property Photo Project Description Owner/Architect Amount
 
 
Photos And Information
Hyperion Treatment Plant Environmental Learning Center West
Playa Del Rey, California
 
Remodeling and renovation of 19,900 sq/ft of existing two story concrete wall and slab building included seismic renovation and Asbestos abatement, new interior wall, new stairs, new railing, new elevator, new windows and curtain walls, site utilities improvement with new landscaping, irrigation and remodeling and extension of existing exterior pond and preparation of 15 new interactive exhibitions for water treatment plant facility for City of Los Angeles. The building is designed to achieve Gold LEED certification rating.

In Progress
City Of Los Angeles Environmental Engineering Division $9,500,000
 
 
 
 
Photos And Information
Utility Infrastructure
Monterey Park, California
To excavate and remove about 50,000 cubic feet of soil and
design and built about 950
liner feet of shoring for future
parking structure about 4,000
linear feet of conduit and trenching and duct bank for electrical
work-and pulling about 30,000
linear feet of telecommunication
and fiber optic wiring. To complete street improvement an Avenida Cesar Chavez included saw
cutting of existing sidewalk, new sidewalk, new curb & gutter,
street lighting modification,
relocation of existing bus stop
and miscellaneous street improvement. To build a new temporary parking area about 134,000 square foot and fire road

Completed: 2006
East Los Angeles College/ LA
Community
College District
(213)-891-2000
$6,242,000
 
 
 
Excavation & Utility Relocation
Santa Monica, California
 
Demolish and expansion of
existing 150,000 sq. ft. of parking
lot, related site utilities relocation, landscape irrigation, and seismic work on existing police station. Also, excavation of 50,000 sq. ft. of new subterranean parking approx. 26
feet deep included soldier piles shoring systems and shotcrete of existing storm drain.   Consist of 5 phases: (1) demolition and civic parking re-model (2) soldier piles and mass excavation (3) utility relocation (4) removal of dirt ramps (5) tie-back detensioning

Completed: 2000
City of Santa Monica Engineering
Department
(310)458-2275 
$3,794,751
 
 

For additional information about our military public projects or general information about  Ford E.C. Inc., please contact us.
 

   

 

© Ford E.C., Inc. All Rights Reserved. Website Design by Sixty Five Design